1. July 27 2001. “200t Reactor Installed On Board Icebreaker”. July 27, Bellona Foundation. Web Site,
2. Cochran, Thomas B., Norris, Robert S. and Bukharin, Oleg A. 1995.Making the Russian Bomb: From Stalin to Yelstin, 287Boulder, CO: Westview Press.
3. Suvorov, G.P., Kuzko, O.V. and Bugreev, M.I. 1999. “Experience of 27/VT Facility Construction and Operation”. Proceedings of the International Conference on Heavy Liquid Metal Coolants in Nuclear Technology. 1999, Obninsk, Russia. Vol. 1, pp.67State Science Center of the Russian Federation‐Institute of Physics and Power Engineering.
4. Gromov, B.F., Toshinsky, G.I., Checkunov, V.V., Orlov, Yu.I., Belomytsev, Yu.S., Gorelov, I.N., Karabash, A.G, Leonchuk, M.P., Pankratov, D.V. and Pashkin, Yu.G. “Designing the Reactor Installation with Lead‐Bismuth Coolant for Nuclear Submarines”. Proceedings of International Conference on Heavy Liquid Metal Coolants in Nuclear Technology. Obninsk, Russia. Vol. I, pp.14State Science Center of the Russian Federation‐Institute of Physics and Power Engineering.