Affiliation:
1. Institute of Production Management and Technology, Hamburg University of Technology, Hamburg, Germany
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Strategy and Management,Computer Science Applications
Reference37 articles.
1. The third comprehensive survey on scheduling problems with setup times/costs
2. A review of scheduling research involving setup considerations
3. A survey of scheduling problems with setup times or costs
4. Bechte, W. 1984. “Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung [Controlling Throughput Times Through Load-oriented Order Release in Job Shops].” PhD diss., University of Hanover, Germany.
5. Bertsch, S. 2015. “Modellbasierte Beschreibung der Termintreue [Model-based Description of Schedule Reliability].” PhD diss., University of Hanover, Germany.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献