Author:
Wakchaure Sanjay S.,Jha Kumar Neeraj
Subject
Industrial and Manufacturing Engineering,Building and Construction,Management Information Systems
Reference44 articles.
1. Agrawal, A.K., Qian, G., Kawaguchi, A., Lagace, S., Delisle, R., Kelly, B., Weykamp, P., Conway, T. and Dubin, E. Deterioration rates of typical bridge elements in New York. Paper presented at the ASCE 2006 Structures Congress and 17th Analysis and Computation Specialty Conference. May18-21, St. Louis, MO.
2. Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods
3. Remarks on the application of the analytic hierarchy process to judgmental forecasting
4. Global supplier selection: a fuzzy-AHP approach
5. Chaphalkar, N.B. (2007) Expert systems for resolution of delay claims in construction contracts, PhD thesis submitted at Department of Civil Engineering, Indian Institute of Technology, Delhi.
Cited by
35 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献