Author:
SMITH ALICE E.,MASON ANTHONY K.
Subject
Economics and Econometrics,General Engineering,Education
Reference39 articles.
1. T. W. Camm , “ Simplified cost models Tor pre feasibility mineral evaluations ,” U.S. Bureau of Mines Report , Western Field Operations Office , Spokane , WA , 1994 .
2. Use of Intervals and Possibility Distributions in Economic Analysis
Cited by
150 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献