1. ADB. (2015). Energy sector assessment summary, RRP AFG 47282-001. https://www.adb.org/sites/default/files/linked-documents/47282-001-ssa.pdf
2. AECOM. (2012). Environmental & social impact assessment (ESIA) report of 100 MW Tidong Hydroelectric Power Project.
3. Integrated modelling of the impacts of hydropower projects on the water-food-energy nexus in a transboundary Himalayan river basin
4. Arvizu, D., Bruckner, T., Chum, H., Edenhofer, O., Estefen, S., Faaij, A., Fischedick, M., Hansen, G., Hiriart, G., Hohmeyer, O., Hollands, K. G. T., Huckerby, J., Kadner, S., Killingtveit, Å., Kumar, A., Lewis, A., Lucon, O., Matschoss, P., Maurice, L., Mirza, M., Mitchell, C. … Zwickel, T. (2011). Technical summary. In O. Edenhofer, R. Pichs-Madruga, Y. Sokona, K. Seyboth, P. Matschoss, S. Kadner, T. Zwickel, P. Eickemeier, G. Hansen, S. Schlömer, C. von Stechow (Eds.), IPCC special report on renewable energy sources and climate change mitigation (pp. 27-158). Cambridge University Press.
5. Climate change impact assessment on the hydrological regime of the Kaligandaki Basin, Nepal