Author:
Chen Dong,Luh Peter B.,Thakur Lakshman S.,Moreno Jack
Subject
Industrial and Manufacturing Engineering
Reference20 articles.
1. A branch & bound method for the general-shop problem with sequence dependent setup-times
2. Chen, T. and Hsia, T. C. Job shop scheduling with multiple resources and an application to a semiconductor testing facility. Proceedings of the 33rd IEEE Conference on Decision and Control. pp.1564–1570. Lake Buena Vista, FL: IEEE.
3. Scheduling products with bills of materials using an improved Lagrangian relaxation technique
4. Simultaneous Resource Scheduling to Minimize Weighted Flow Times
5. Dobson, G. and Karmarkar, U. S. Large scale shop scheduling: formulations and decompositions. Presented at the LAAS Paris Workshop on Production Planning and Scheduling. Toulouse, France.
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献