Author:
Tseng Y.-J.,Jhang J.-F.,Huang F.-Y.
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Strategy and Management
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A hierarchical parallel multi-station assembly sequence planning method based on GA-DFLA;Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science;2020-12-03
2. Efficient approximation scheme for job assignment in a multi-factory environment;Journal of Industrial and Production Engineering;2020-08-07
3. Multi-site planning and scheduling: state-of-the-art review and future research directions;Journal of Global Operations and Strategic Sourcing;2019-07-04
4. IoT-Enabled Smart Assembly Station;Optimization of Manufacturing Systems Using the Internet of Things;2017
5. Quadratic assignment problem mathematical modelling for process planning;International Journal of Computer Integrated Manufacturing;2015-07-27