1. International Energy Agency (IEA) and Global Alliance for Buildings and Construction (GlobalABC) (2018) 2018 Global Status Report: Towards a zero-emission, efficient and resilient buildings and construction sector,” United Nations Environment Programme. [Online]. Available: https://www.worldgbc.org/sites/default/files/2018%20GlobalABC%20Global%20Status%20Report.pdf
2. Röck M et al (2019) Embodied GHG emissions of buildings – The hidden challenge for effective climate change mitigation. Appl Energy 114107. https://doi.org/10.1016/j.apenergy.2019.114107
3. Jackson R (2018) Project focus: the TallWood House at Brock Commons, Vancouver. Struct Eng J Inst Struct Eng 96(10):18–25
4. Foliente GC (2000) History of Timber Construction. ASTM Int
5. Page M (2017) A robotic fabrication methodology for dovetail and finger jointing: an accessible & bespoke digital fabrication process for robotically-milled dovetail & finger joints. In: Proceedings of the 37th Annual Conference of the Association for Computer Aided Design in Architecture (ACADIA), Cambridge, MA, pp 456–463. [Online]. Available: http://papers.cumincad.org/cgi-bin/works/Show?acadia17_456