1. Curtiss-Wright Corporation, “Engineer, Design, Construct, Test and Evaluate a Pressurized Fluidized Bed Pilot Plant Using High Sulfur Coal for Production of Electrical Power”, U.S. DOE Contract No. EX-76-C-01-1726.
2. R. L. McCarron and R. P. Brobst: “Gas Turbine Blade Materials’ Corrosion in the Effluent from a Pressurized Fluidized Bed Combustor”, ASME Paper No. 84-GT-208. See also Quarterly Report No. DOE/ ET/15457-1112, January-March 1982, prepared for U.S. DOE under Contract No. DE-AC21-79ET15457.
3. R.L. McCarron: work in progress on EPRI Research Project RP1337-1.
4. R. L. McCarron: work in progress under EPRI Research Project RP 979-12. See also NCB (IEA Grimethorpe) Ltd., “Turbine Blade Test Cascade Modifications and Operation, August 1982 to April 1983”, Report No. GEF/R/83/12, March 1984.
5. National Coal Board Report to the Environmental Protection Agency, “Reduction of Atmospheric Pollution”, Report Number DHB 060971, 1971.