Author:
Kumar Uday,Verma Ajit Kumar,Das Piyush Pratim
Reference8 articles.
1. Shanks AJ (2008) Technology management in warship acquisition. In: INEC, Apr 2008, pp 1–11
2. Raper RG (1970) Designing warships for a cost-effective life, vol 185. Parsons Memorial Lecture
3. Xie L, Wei RX, Jiang TJ, Zhang P (2009) Generalized PLS regression forecast modeling of warship equipment maintenance cost. In: 16th annual conference proceedings, 2009 international conference on management science and engineering, ICMSE 2009, pp 607–612
4. Tixier J, Dusserre G, Salvi O, Gaston D (2002) Review of sixty-two risk analysis methodologies of industrial plants. J Loss Prev Process Ind 15(4):291–303
5. Dikis K, Lazakis I, Taheri A, Theotokatos G (2015) Risk and reliability analysis tool development for ship machinery maintenance. In: 5th international symposium on ship operations, management and economics, Athens, Greece, 28–29 May 2015, pp 1–10