Author:
Belwal Ankit,Thapliyal Shipra,Jhinkwan Vipendra Singh
Publisher
Springer Nature Singapore
Reference12 articles.
1. Ketchum, M. A. (1986). Redistribution of stresses in segmentally erected prestressed concrete bridges UCB/SESM-86/07. Department of Civil Engineering, University of California, Berkeley.
2. Chiu, H. I., Chern, J. C., & Chang, K. C. (1996). Long-term deflection control in cantilever prestressed concrete bridges I: Control method. Journal of Engineering Mechanics, ASCE, 12(6), 489–494.
3. Cruz, P. J. S., Mari, A. R., & Roca, P. (1998). Nonlinear time-dependent analysis of segmentally constructed structures. Journal of Structural Engineering, ASCE, 124(3), 278–288.
4. Somja, H., & Goyet, V. V. (2008). A new strategy for analysis of erection stages including an efficient method for creep analysis. Engineering Structures, 30, 2871–2883. [11] Cho, T., & Kim, T. S. Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis. Finite Elements in Analysis and Design
5. Kwak, H. G., & Son, J. K. (2002). Determination of design moments in bridges constructed by balanced cantilever method. Engineering Structures, 24, 639–648.