Author:
Chakraborty Abhishek,Fernando M. P. S.,Pradhan A. S.
Reference10 articles.
1. Bhardwaj, S.A.: The future 700 MWe pressurized heavy water reactor. Nucl. Eng. Des. 236(7–8), 861–871 (2006)
2. Tiwari, A.P., Banyopadhyay, B., Govindarajan, G.: Spatial control of a large pressurized heavy water reactor. IEEE Trans. Nucl. Sci. 43(4), 2440–2453 (1996)
3. Preliminary Safety Assessment Report for 700 MWe PHWR
4. Konheiser, J., Seidl, M., Brachem, C., Mueller, S.: Study of the uncertainties due to position change of the PWR aeroball measurement system. J. Nucl. Sci. Technol. (2016). https://doi.org/10.1080/00223131.2016.1151840
5. Mitin, V., Tsimbalov, S.: Power distribution measurement and control for VVER-1000 Cores. Organisation for Economic Co-Operation and Development, Nuclear Energy Agency of the OECD (NEA) (1992)