Author:
Masoud Banan,Al-Saiari Nada,Al-Shareef Noor,Munshi Yara,Bano Farheen
Reference17 articles.
1. Chen, J., Chen, C., Su, L., Wu, H., Sun, C.: Assembly line balancing in garment industry. Expert Syst. Appl. 39(11), 10073–10081 (2012)
2. Hui, C.L.P., Ng, S.F.F.: A study of the effect of time variations for assembly line balancing in the clothing industry. Int. J. Cloth. Sci. Technol. 11(4), 181–188 (1999)
3. Chung, Y.-C., Hsu’, Y.-W.H., Yen, T.-M.: Using the six sigma system approach to reduce core process times at a manufacturing plant. Int. J. Manag. 9 (2008)
4. Wang, P., Rempel, D., Harrison, R., Chan, J., Ri, B.: Work-organizational and personal factors associated with upper body musculoskeletal disorders among sewing machine operators. Occup. Environ. Med. 64(12), 806–813 (2007)
5. Sarder, B., Imrhan, S.N., Mandahawi, N.: Ergonomic workplace evaluation of an Asian garment-factory. J. Hum. Ergol. 35, 45–51 (2006)