1. Allen JW, Bruce F (2007) Wollenberg: Power generation operation and control. 2nd edn. India: Wiley 131–155
2. Tang L, Che P (2013) Generator scheduling under a CO2 emission reduction policy in the deregulated environment. IEEE Trans Eng Manage 60(2):387–397
3. Senthivadivu A, Gayathri K, Asokan K (2018) Exchange market algorithm-based profit-based unit commitment GENCOs considering environmental emissions. Int J Appl Eng Res 13(21):14997–15010
4. Hamdi Abdi (2020) Profit-based unit commitment problem: A review of models, methods, challenges, and future directions. Renew Sustain Energy Rev
5. Padhy NP (2003) Unit commitment problem under deregulated environment-a review. In: Proceeding of IEEE power engineering society general meeting, pp 1088–1094