1. Li H (2017) What is the reason causing the construction cost of the error. Archit Knowl 37(02):40–41
2. Lu Y, Gen P, Qiao S (2021) Analysis of cost deviation and countermeasures of power transmission and transformation projects. China Power Enterpr Manag 33:82–83
3. Xu W, Feng W, Zhang D (2016) Analysis of deviation from the target of cost control in the whole process of power transmission and transformation project construction. China Power Enterpr Manag (12):40–48
4. Chen J, Hou K, Gao X (2016) Research on cost reasonability evaluation method of power transmission and transformation projects. Southern Power Syst Technol 10(08):95–101
5. Belay AM, Torp O (2017) Do longer projects have larger cost deviation than shorter construction projects? Procedia Eng 196:262–269