1. Yan, J.J., Yang, Z.X., Gu, J.N.: Research on structure mapping method of BOM multi-view [J]. Modul. Mach. Tool Autom. Manuf. Tech. 2, 22–25 (2020). (in Chinese)
2. Zhang, H., Wu, J.J., Fei, T.M., Zhang, S.W.: Research on assembly BOM conversion method for information integration[J]. J. Jiangsu Univ. Sci. Technol. (Nat. Sci. Ed.) 34(01), 41–48 (2020)
3. Wang, J.T., Si, S.B.: The integrated modeling method for the maintenance BOM of complex equipments [J]. Mach. Des. Manuf. Eng. 40(23), 50–54 (2011). (in Chinese)
4. Zhang, H., Shi, S.Y., Shi, Q.: PLM-oriented BOM data management and practice [J]. Manuf. Autom. 40(8), 30–34 (2018). (in Chinese)
5. Geng, J.G., Cai, C.Z., Ni, Y.Q., Wen, X.L.: Design and implementation of multi-view dynamic management framework for product structure [J]. Mod. Manuf. Eng. 11, 45–50 (2015). (in Chinese)