1. P.K. Pareek, T.V. Nandikolmath, P. Gowda, FMEA implementation in a foundry in Bangalore to improve quality and reliability. Int. J. Mech. Eng. Robot. Res. 1(2), 81–87 (2012)
2. T. Nandikolmath, P.K. Pareek, S.A. Vasantha Kumara, Implementation of a lean model for carrying out value stream mapping in manufacturing industry. Int. J. Mech. Eng. Robot. Res. 1(2), 88–95 (2012)
3. P.K. Pareek, P. Gowda et al., Ergonomics in a foundry in Bangalore to improve productivity. Int. J. Eng. Soc. Sci. 2(5), 1–6 (2012). ISSN: 2249- 9482
4. S. Soman, P.K. Pareek, J. Phys. Conf. Ser. 1427 012010 6 2020; P.K. Pareek, Optimization of the critical parameters affecting the fuel lid performance (2019) 2019-28-2413
5. P.K. Pareek, in ROC Structure Analysis of Lean Software Development in SME’s Using Mathematical CHAID Model (17 May 2019)