The Impacts of Interim Payment Default in Public Projects: A Study in Kano State, Nigeria
Author:
Publisher
Springer Nature Singapore
Link
https://link.springer.com/content/pdf/10.1007/978-981-97-0751-5_89
Reference28 articles.
1. Badroldin MKAM, Hamid ARA, Raman SA, Zakaria R, Mohandes SR (2016) Late payment practices in the Malaysian construction industry. Malays J Civil Eng 28(3). https://doi.org/10.11113/mjce.v28.16005
2. Kshaf DA, Mohamed MA, El-Dash KM (2022) The major problems between main contractors and subcontractors in construction projects in Egypt. Ain Shams Eng J 13(6):101813. https://doi.org/10.1016/j.asej.2022.101813
3. Perera BAKS, Dewagoda KG (2021) Streamlining the management of payment delays: the case of Sri Lankan government building construction projects. J Financ Manage Property Constr 26(2): 236–256. https://doi.org/10.1108/JFMPC-05-2020-0041
4. Sonmez R, Ahmadisheykhsarmast S, Güngör AA (2022) BIM integrated smart contract for construction project progress payment administration. Autom Constr 139:104294. https://doi.org/10.1016/j.autcon.2022.104294
5. Das M, Luo H, Cheng JC (2020) Securing interim payments in construction projects through a blockchain-based framework. Autom Constr 118:103284. https://doi.org/10.1016/j.autcon2020.103284
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3