Author:
Ali Elbeblawi Mostafa Mohamed,Abdelhak Elsaghier Hassan Ali,Mohamed Amin Mostafa Tantawy,Elrawy Abdellah Wael Rashad
Reference40 articles.
1. Alshibani A, Moselhi O (2012) Least cost optimization of scraper–pusher fleet operations. Can J Civ Eng 39
2. Montaser A, Moselhi O (2013) Tracking scraper-pusher fleet operations using wireless technologies. In: 4th construction specialty conference. Montréal, Québec, May 29 to June 1
3. Alkass S, Harris F (1988) An expert system for earthmoving equipment selection in road construction. J Constr Eng Manag 114(3):426–440. https://doi.org/10.1061/(ASCE)0733-9364(1988)114:3(426)
4. Anon GD (1997) Caterpillar performance handbook. Caterpillar Inc., Illinois, IL, USA
5. Brinkschulte L, Geimer M (2017) Real-time estimation of the remaining lifetime of components. ATZoffhighway worldwide 03:54–60