1. Nasir NM, Nasrun M, Nawi M, Kamarul M, Abdul I, Bahaudin AY (2016) A review of delay factors in Malaysian industralised building system (IBS) construction project. ARPN J Eng Appl Sci 11:9868–9873
2. Abedi M, Fathi MS, Rawai NM (2012) A review of industrialised building system in Malaysian construction industry. In: Proceeding of Management in construction research association (MiCRA) postgraduate conference
3. Ariffin ST, Yunus R, Mohammad H, Khalijah S (2017) A preliminary review on economies of scale (EOS) towards industrialized building system (IBS) manufacturer. In: MATEC web of conferences, p 9
4. Meynagh et al MM, (2014) Main factors of contractor reluctancy to adopt IBS projects in Malaysia. Australian Journal of Basic and Applied Sciences 8:251–254
5. Amin MAM et al (2017) A review on the current issues and barriers of industrialised building system (IBS) adoption in Malaysia’s construction industry. In: IOP conference series: materials science and engineering, vol 9, pp 1757–899