1. Abo-Sinna M (2001) A bi-level non-linear multi-objective decision making under fuzziness. Opsearch-New Delhi 38(5):484–495
2. Branch K, Baker K (2007) Security during the construction of critical infrastructure in the post 9/11 context in the u.s. In: 8th annual conference on human factors and power plants. Institute of Electrical and Electronics Engineers (IEEE), Monterey
3. Cai J (2009) Hydropower in China. Master’s thesis, University of Gavle
4. Chadli O, Mahdioui H, Yao JC (2011) Bilevel mixed equilibrium problems in banach spaces: existence and algorithmic aspects. J Ind Manag Optim 1:549–561
5. Chankong V, Haimes Y (1983) Multiobjective decision making: theory and methodology. North-Holland, New York