Author:
Mishra Apoorv,Vilventhan Aneetha
Publisher
Springer Nature Singapore
Reference23 articles.
1. Ahn, K. U., Kim, Y. J., Park, C. S., Kim, I., & Lee, K. (2014). BIM interface for full vs. semi-automated building energy simulation. Energy and Buildings, 68, 671–678. https://doi.org/10.1016/j.enbuild.2013.08.063
2. Atkin, B., & Bildsten, L. (2017). Editorial: a future for facility management. Construction Innovation, 17(2), 116–124. https://doi.org/10.1108/CI-11-2016-0059
3. Azhar, S., Hein, M., & Sketo, B. (2008). Building information modeling (BIM): benefits, risks and challenges. In Proceedings of the 44th ASC Annual Conference.
4. Baldauf, J. P., Formoso, C. T., & Tzortzopoulos, P. (2021). Method for managing requirements in healthcare projects using building information modelling. Engineering Construction and Architectural Management, 28(8), 2090–2118. https://doi.org/10.1108/ECAM-12-2020-1040
5. Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM - a case study approach. Automation in Construction, 24, 149–159. https://doi.org/10.1016/j.autcon.2012.02.008