Author:
Nguyen Phong Thanh,Pham Linh Vu Ba,Nguyen Thu Anh,Nguyen Quan Khac,Phan Phuong Thanh,Le Hang Thi Thu
Publisher
Springer Nature Singapore
Reference18 articles.
1. Iqbal S, Choudhry RM, Holschemacher K, Ali A, Tamošaitienė J (2015) Risk management in construction projects. Technol Econ Dev Econ 21(1):65–78
2. Luong D-L, Tran D-H, Nguyen PT (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. Int J Constr Manag 21(3):271–283
3. Tran PQ, Huynh TTY, Dang TT, Tran NTQ, Nguyen PT (2022) Evaluating risks in Ho Chi Minh city urban railway project using analytic network process. AIP Conf Proc 2453(1):020071
4. Siraj NB, Fayek AR (2019) Risk identification and common risks in construction: literature review and content analysis. J Constr Eng Manag ASCE 145(9):03119004
5. Assaf S, Hassanain MA, Abdallah A (2018) Review and assessment of the causes of deficiencies in design documents for large construction projects. Int J Build Pathol Adapt 36(3):300–317