Author:
Chen Angela Hsiang-Ling,Liang Yun-Chia,Padilla Jose David
Reference60 articles.
1. H. Aytug, M.A. Lawley, K. McKay, S. Mohan, R. Uzsoy, Executing production schedules in the face of uncertainties: a review and some future directions. Eur. J. Operation. Res. 161(1), 86–110 (2005)
2. S.D. Wu, R.H. Storer, P.C. Chang, One machine rescheduling heuristics with efficiency and stability as criteria. Comput. Operation. Res. 20, 1–14 (1993)
3. W. Herroelen, R. Leus, Project scheduling under uncertainty-survey and research potentials. Eur. J. Operation. Res. 165(2), 289–306 (2005)
4. J.R. Turner, R. Müller, On the nature of the project as a temporary organization. Int. J. Project Manag. 21:1–8 (2003)
5. A.H.L. Chen, Y.C. Liang, J.D. Padilla, An experimental reactive scheduling framework for the multi-mode resource constrained project scheduling problem, in Lecture Notes in Engineering and Computer Science: Proceedings of the International MultiConference of Engineers and Computer Scientists 2017, pp. 853–858, Hong Kong, 15–17 March 2017