1. Peurifoy R, Ledbetter W, Schexnayder C (1996) Construction planning, equipment, and methods, 5th edn. The McGraw-Hill Companies Inc., New York
2. Jackson S (2002) Project cost overruns and risk management. school of construction management and engineering, The University of Reading
3. Nunnally S (2010) Construction methods and management, 8th edn. Prentice Hall, Upper Saddle River, N.J.
4. AbouRizk S, Hajjar D (1998) A framework for applying simulation in construction. Can J Civ Eng 25(3):604–617
5. Marzouk M, Moselhi O (2002) Simulation optimization for earthmoving opurations gsing aenetic Algorithms. Constr Manag Econ 20(6):535–543