Uncertain Resource-Constrained Project Scheduling Problem with Net Present Value Criterion for Risk-Averse Decision Makers
Author:
Zhao Chenkai,Ke Hua
Publisher
Springer Singapore
Reference36 articles.
1. Herroelen W, Demeulemeester E, De Reyck B (1999) A classification scheme for project scheduling. In: project scheduling: recent models, algorithms and applications. Kluwer, Amsterdam, pp 1–26
2. Kolisch R, Padman R (2001) An integrated survey of deterministic project scheduling. Omega 29(3):249–272
3. Herroelen WS, Van Dommelen P, Demeulemeester EL (1997) Project network models with discounted cash flows: a guided tour through recent developments. Eur J Oper Res 100(1):97–121
4. Wang L, Fang C (2012) An e ective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem. Comput Oper Res 39(2):449–460
5. Fang C, Kolisch R, Wang L, Mu C (2015) An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem. Flex Serv Manuf J 27(4):585–605