Publisher
Springer Nature Singapore
Reference22 articles.
1. Tsarouhas, P.: Implementation of total productive maintenance in the food industry a case study. J. Qual. Maintenance Eng. (2007)
2. Tsarouhas, P.: Reliability, availability, and maintainability (RAM) study of an ice cream industry. Appl. Sci. 10(12), 4265 (2020)
3. Sharma, N.K., Kumar, S., Sharma, N.: Performance analysis of a juice packaging plant using BFT. Malaya J. Matematik 41–45 (2018). Retrieved from https://www.researchgate.net/publication/322752806_Performance_analysis_of_a_juice_packaging_plant_using_BFT
4. Tsarouhas, P.H., Arvanitoyannis, I.S., Ampatzis, Z.D.: A case study of investigating reliability and maintainability in a Greek juice bottling medium size enterprise (MSE). J. Food Eng. 95(3), 479–488 (2009)
5. Bertocci, F., Mugnaini, M., Fort, A., Vignoli, V., Spicciarelli, L.: Reliability and availability of industrial bakery plant: modeling and analysis. Case Study (2016)