Author:
Ma Jian-hua,Hu Rong,Guo Ning,Qian Bin
Publisher
Springer Nature Singapore
Reference14 articles.
1. Mraihi, T., Driss, O.B., El-Haouzi, H.B.: Distributed permutation flow shop scheduling problem with worker flexibility: Review, trends and model proposition. Expert Syst. Appl. 121947 (2023)
2. Schulz, S., Schönheit, M., Neufeld, J.S.: Multi-objective carbon-efficient scheduling in distributed permutation flow shops under consideration of transportation efforts. J. Clean. Prod. 365, 132551 (2022)
3. Mohammadi, S., Al-e-Hashem, S.M.J.M., Rekik, Y.: An integrated production scheduling and delivery route planning with multi-purpose machines: a case study from a furniture manufacturing company. Int. J. Prod. Econ. 219, 347–359 (2020)
4. Zhou, F., Hu, R., Qian, B., et al.: Hyper-heuristic three-dimensional estimation of distribution algorithm for solving distributed permutation flow-shop and vehicle transportation integrated scheduling problem. Acta Electonica Sin. 49(12), 2419 (2021)
5. Shen, Q.Y., Guo, N., Hu, R., et al.: Hyper-heuristic ant colony optimization algorithm for multi-objective two-echelon vehicle routing problem with time windows. In: International Conference on Intelligent Computing. Singapore: Springer Nature Singapore, pp. 168–180 (2023)