Author:
Qudrat-Ullah Hassan,Panthallor Pramela Nair
Reference52 articles.
1. Amankwah, H., Larsson, T., & Textorius, B. (2014, January 5). A maximum flow formulation of a multi-period open-pit mining problem. Operations Research International Journal, 1–10.
2. Asad, M. W., & Topal, E. (2011, November). Net present value maximization model for optimum cut-off grade policy of open pit mining operations. The Journal of the Southern African Institute of Mining and Metallurgy, 111, 741–750.
3. Asad, M., & Dimitrakopoulos, R. (2012, April 25). Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand. Journal of the Operational Research Society, 185–197.
4. Bullock, L. R. (n.d.). Mineral property feasibility studies. In L. R. Bullock, SME Mining Engineering Handbook (pp. 227–261).
5. Burt, R. (1991, May). The international diffusion of technology in the early modern period: the case of the British non-ferrous mining industry. The Economic History Review, 44(2), 249–271. doi:https://doi.org/10.2307/2598296.