Author:
Mousavi S. J.,Nakhaei P.,Sadollah Ali,Kim Joong Hoon
Reference16 articles.
1. Afzali, R., Mousavi, S.J., Ghaheri, A.: A reliability-based simulation optimization model for multi-reservoir hydropower systems operation: Khersan experience. J. Water Resour. Plan. Manag. 134(1), 24–33 (2008). ASCE
2. Barros, M.T.L., Tsai, F.T.-C., Yang, S.-L., Lopes, J.E.G., Yeh, W.W.-G.: Optimization of large-scale hydropower system operations. Water Resour. Plan. Manag. 129(3), 178–188 (2003). ASCE
3. Chakraborty, P., Roy, G.G., Das, S., Jain, D., Abraham, A.: An improved harmony search algorithm with differential mutation operator. Fundam. Inform. 95, 1–26 (2009)
4. Diaz, G.E., Fontane, D.G.: Hydropower optimization via sequential quadratic programming. Water Resour. Plan. Manag. 115(6), 715–733 (1989). ASCE
5. Gao, X.Z., Wang, X., Ovaska, S.J.: Uni-modal and multi-modal optimization using modified harmony search methods. Int. J. Innov. Comput. Inf. Control 5(10A), 2985–2996 (2009)
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献