1. Liu, D., Lu, X., Ni, Z.: Study on the transportation planning of steel pipes for the west segment of the second west-east gas pipeline project. In: 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, vol. 2, pp. 2983–2988. IEEE (2008)
2. Liu, B.L., Chen, W., Lei, L., et al.: Material performance data acquisition and management system for welded pipe used in the 2nd west-east gas pipeline. Adv. Mater. Res. 581–582, 1176–1179 (2012)
3. Li, H.L., Ji, L., Kang, T.W.: Significant technical progress in the west-east gas pipeline projects-line one and line two. Nat. Gas. Ind. 30(4), 1–9 (2010)
4. Zhang, L.J., Zhang, Z., Cao, F.H., et al.: Study of the X70 pipeline steel corroding in 3.0wt% NaCl solution using electrochemical impedance spectroscopy technique. Acta Metallurgica Sinica (English Letters) 17(6), 907–911 (2004)
5. Li, G.F., Zhang, G.L., Zhou, J.J., et al.: Characteristics and mechanism of high pH stress corrosion cracking of pipeline steel X70. Key Eng. Mater. 353–358, 219–222 (2007)