1. Jayesh Jain M, Reja VK, Varghese K (2022) Exploring the critical factors affecting the productivity of microtunneling pipe installation. In: 38th international No-Dig. Helsinki, Finland
2. Reja VK, Varghese K, Ha QP (2022) As-built data acquisition for vision-based construction progress monitoring: a qualitative evaluation of factors. In: Proceedings of the 10th world construction symposium, 24–26 June 2022, Sri Lanka, pp 138–149
3. The last planner system of production control by Herman Glenn Ballard—A thesis submitted to the Faculty of Engineering of The University of Birmingham for the degree of Doctor of Philosophy
4. Fauchier D, Alves TDCL (2013) Last planner® system is the gateway to lean behaviors. In: Formoso CT, Tzortzopoulos P (eds) 21st annual conference of the international group for lean construction. Fortaleza, Brazil, 31 July–2 Aug 2013, pp 559–568
5. Drysdale D (2013) Introducing lean improvement into the UK highways agency supply chain. In: Formoso CT, Tzortzopoulos P (eds) 21th annual conference of the international group for lean construction. Fortaleza, Brazil, 31 July–2 Aug 2013, pp 1067–1074