1. Li, F.-Y., Lu, G.-B., Zhang, L.-F.: Improved double PI control for nuclear steam generator water level. Atomic Energy Sci. Technol. 44(Suppl.), 279–282 (2010)
2. Wu, Y.-W., Zhuang, C.-J., Su, G.-H.: Transient thermal-hydraulic characteristics analysis software for pwr nuclear power systems. Nuclear Power Eng. 31(2), 47–49 (2010)
3. Habibiyan, H., Setayeshi, S., Arab-Alibeik, H.: A fuzzy gain scheduled neural controller for nuclear steam generators. Annals of Nuclear Energy 31(15), 1765–1781 (2004)
4. Jizhou, Z., Jianqiang, S., Bin, Z.: Operation of Pressurized Water Reactor Nuclear Power Plant. Atomic Energy Press, Beijing (2008)
5. Guozhen, M., Jisheng, Q.: Commissioning and Start-up. Atomic Energy Press, Beijing (2000)