1. Wang Z, Wu Q-q (2002) Research on semiconductor production line control and scheduling. Comput Integr Manuf Syst 8(8):607–611
2. Cao G, You H, Jiang Z et al (2008) Dynamic hierarchical planning and scheduling method for semiconductor production line based on TOC. Modul Mach Tool Autom Manuf Technol 2008(10)
3. Shi B, Qiao F, Ma Y (2009) Research on dynamic scheduling of semiconductor production line based on fuzzy Petri net reasoning. Mechatronics 15(4):29–32
4. Wang L, Lu X, Zheng Y (2007) Research on dynamic scheduling of semiconductor production line based on multi-agent technology. Comput Eng 33(13):4–6
5. Wu Q-q, Ma Y-m, Li L et al (2015) Data-driven dynamic scheduling method for semiconductor production line. Control Theory Appl 32(9):1233–1239