1. Pan CR, Zhou MC, Qiao Y, et al (2017) Scheduling cluster tools in semiconductor manufacturing: recent advances and challenges. IEEE Trans Autom Sci Eng
2. Wang Z, Wu Q (2002) Research on control and scheduling of semiconductor production line. Comput Integr Manuf Syst 8(8):607–611
3. Cao G, You H, Jiang Z, et al (2008) Dynamic hierarchical planning and scheduling method of semiconductor production line based on TOC. Mod Mach Tool Autom Process Technol 2008(10).
4. Shi B, Qiao F, Ma Y (2009) Research on dynamic scheduling of semiconductor production line based on fuzzy Petri net reasoning. Mechatronics 15(4):29–32
5. Wang L, Lu X, Agent Y (2007) Research on dynamic scheduling of semiconductor production line based on multi-agent technology. Comput Eng 33(13):4–6