1. Hayashi A, Ishii N, Matusi M (2009) A theory and tools for collaborative demand-to-supply management in the SCM Age. Oper Suppl Chain Manage 2:111–124
2. Ishii N, Fuchino T, Muraki M (1997) Life cycle oriented process synthesis at conceptual planning phase. Comput Chem Eng 21:S953–S958
3. Ishii N (2004) A heuristic procedure for planning flexible production systems for competitive supply chains. Paper presented at the 1st international congress on logistics and SCM systems, Waseda University, Tokyo, 2004
4. Matsui M (2002) A management game theory: economic traffic, leadtime and pricing setting. J Jpn Ind Manage Assoc 53:1–9
5. Matsui M, Takahashi Y, Wang Z (2006) A construction and theory of the manager-aided planner for collaborative demand and supply. J Jpn Ind Manage Assoc 57:120–131