1. Chen, G.P., Li, M.J., Xu, T., et al.: Research on technical bottleneck of new energy development. Proc. CSEE 37(01), 20–27 (2017). (in Chinese)
2. He, J.B., Zhuang, W., Xu, T., et al.: Risk analysis and countermeasures of cascading off-grid of wind turbines caused by transient overvoltage. Power Syst. Technol. 40(06), 1839–1844 (2016). (in Chinese)
3. Ma, J., Zhao, D.W., Qian, M.H., et al.: Review on operation control technology of large-scale new energy access weak synchronous support DC transmission end power grid. Power Syst. Technol. 41(10), 3112–3120 (2017). (in Chinese)
4. Zhao, X.M., Li, Y.L., Sun, G.Y., et al.: Effect of commutation failure on overvoltage at the sending end of AC/DC hybrid system with wind farm. High Volt. Eng. 45(11), 3666–3673 (2019). (in Chinese)
5. Jia, J.C., Jin, Y.D., Zhao, B., et al.: Influence and optimization of wind turbine low voltage ride-through control on system transient overvoltage. Power Syst. Technol. 45(02), 526–533 (2021). (in Chinese)