Author:
Liu Yulong,Wang Ying,Cao Li,Chen Xiaoqiang,Hao Zhengqing
Reference10 articles.
1. Ying W, Zhigang L, Xiuqing M et al (2016) An extended Habedank’s equation-based EMTP model of pantograph arcing considering pantograph-catenary interactions and train speeds [J]. IEEE Trans Power Deliv 31(3):1186–1194
2. Bruni S, Ambrosio J, Carnicero A et al (2015) The results of the pantograph catenary interaction benchmark. Veh Syst Dyn 53(3):412–435
3. Lee H, Park W, Oh K et al (2015) Analysis of dynamic interaction between catenary and pantograph with experimental verification and performance evaluation in new high-speed line. Veh Sys Dyn 53(8):1117–1134
4. Jing J, Liu Zhigang, Yang S (2015) Simulation study on dynamic behavior of pantograph-catenary considering the nonlinear characteristics of pantograph. Comput Simul 32(2):170–174 (in Chinese)
5. Abdullah A, Michitsuji Y, Nagai M et al (2010) Integrated simulation between flexible body of catenary and active control pantograph for contact force variation control. J Mech Syst Transp Logistics 3(1):166–177