Publisher
Springer Nature Singapore
Reference10 articles.
1. MI Tengfei, F.: Analysis of influencing factors of resource allocation of railway container terminal. China Water Transp. 19(9), 65–66 (2019) (in Chinese)
2. Wang Xiaohan, F., Jia Yulin, S, Cai Jiaxin, T.: Joint optimization of resource allocation and operation scheduling at railway container terminals. Control. Decis. 36(12), 3063–3073 (2021) (in Chinese)
3. Tschöke Martin, F., Boysen Nils, S.: Container supply with multi-trailer trucks: parking strategies to speed up the gantry crane-based loading of freight trains in rail yards. OR Spectr. 40, 319–339 (2018)
4. Stephan, K., Boysen, N.: Crane scheduling in railway yards: an analysis of computational complexity. J. Sched. 20(5), 507–526 (2017)
5. Guo, P.F., He, X.S., Luan, Y., Wang, Y.T.: Logic-based Benders decomposition for gantry crane scheduling with transferring position constraints in a rail–road container terminal. Eng. Optim. 53(1), 86–106 (2021)