1. Q.L. Xue, H.L. Zhai, R. Joshua, An urban island floating on the MTR station: a case study of the West Kowloon development in Hong Kong. Urban Des. Int. 15, 191–207 (2010)
2. W.L. Hsu, Approximation algorithms for the assembly line crew scheduling problem. Math. Oper. Res. 9, 376–383 (1984)
3. F. Croci, M. Perona, A. Pozzetti, Work force management in automated assembly systems (2000). Retrieved from https://www.inc.com/encyclopedia/assembly-line-methods.html
4. G. Zhang, Learning from the past, planning for the future. MTR Projects J. 5, 45–48 (2015)
5. PRC Rail Consulting Ltd., The railway technical website. Retrieved from https://www.railway-technical.com/trains/rolling-stock-manufacture.html