1. Briskorn D, Hartmann S (2021) Anwendungen des Resource-Constrained Project Scheduling Problem in der Produktionsplanung. Springer, Berlin Heidelberg, pp 133–157. 1.1
2. Cantarelli CC, Flybjerg B, Molin EJE, van Wee B (2018) Cost overruns in large-scale transport infrastructure projects. Autom Constr 2(1)
3. Cervantes MM (2010) New metaheuristic methods for efficient, optimized and robust allocation of limited resources. Polytechnic University of Valencia. 1.1, 2.2, 2.2.1, 2.2.2, 2.2.4, 2.3.3
4. Choi BC, Park MJ (2015) A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs. Eur J Oper Res 244. 2.3.4, 2.5.1
5. Dridi O, Krichen S, Guitouni A (2013) A multicriteria genetic algorithm for the resource constrained task scheduling problem. Metaheuristics Prod Sched 1:1