1. Jerald J, Asokan P, Prabaharan G, Saravanan R (2005) Scheduling optimization of flexible manufacturing systems using particle swarm optimization algorithm. Int J Adv Manuf Technol 2(5):964–971
2. Roshanaei V (2012) Mathematical modeling and optimization of flexible job shops scheduling problem. Electronic theses and dissertations. University of Windsor
3. Smith SF (2003) Is scheduling a solved problem. In: 1st international conference on multidisciplinary scheduling theory and applications, August 2003, 13–15, Nottingham, UK
4. Kumar A, Prakash, Tiwari MK, Shankar R, Baveja A (2006) Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm. Eur J Oper Res 17(5):1043–1069
5. Sreedhar Kumar AVS, Veeranna V, Durgaprasad B (2015) Multi objective scheduling of jobs in flexible manufacturing system using met heuristic approaches with inclusion of simulation modeling. Int J Comput Eng Res Trends 2(4):264–269