1. Ajami NK, Duan QY, Sorooshian S (2007) An integrated hydrologic Bayesian multimodel combination framework: confronting input, parameter, and model structural uncertainty in hydrologic prediction. Water Resour Res 43(1):W01403
2. Arya DS, Goel NK, Dhamy AP (2010) Design flow and stage computations in the Teesta River, Bangladesh, using frequency analysis and MIKE 11 modeling. J Hydrol Eng 16(2):176–186
3. Ba HH, Guo SL, Wang Y, Hong XJ, Zhong YX (2017) Improving ANN model performance in runoff forecasting by adding soil moisture input and using data preprocessing techniques. Hydrol Res
4. Bárdossy Götzinger J (2008) A Generic error model for calibration and uncertainty estimation of hydrological models. Water Resour Res 44(12):1393–1442
5. Bárdossy A, Li J (2008) Geostatistical interpolation using copulas. Water Resour Res 44:W07412