1. Alvarado RG, Muñoz JJ (2012) The control of shape: origins of parametric design in architecture in Xenakis, Gehry and Grimshaw. METU J Faculty Archit 29(1):107–118
2. Ankel S (2020) A construction expert broke down how China built an emergency hospital to treat Wuhan coronavirus patients in just 10 days. Business Insider Australia. Available at https://www.businessinsider.com.au/how-china-managed-build-entirely-new-hospital-in-10-days-2020-2
3. Ashurst (2017) The future is now: embracing technology in the construction sector. Built Environment Insights. Available at https://www.ashurst.com/en/news-and-insights/insights/the-future-is-now-embracing-technology-in-the-construction-sector/
4. BuildingSmart Australasia (2019) Building without barriers: the business case for interoperability. White paper. Available at https://www.buildingsmart.org/wp-content/uploads/2019/05/buildingSMART-A5_Brochure_V10_.pdf
5. Counsell J, Taylor T (2017) What are the goals of HBIM? In: Arayici Y, Counsell J, Mahdjoubi L, Nagy G, Hawas S, Dewidar K (eds) Heritage building information modelling. Routledge