1. Australian Energy Market Operator. Black system South Australia 28 September 2016: final report [EB/OL]. https://www.aemo.com.au/-/media/Files/Electricity/NEM/MarketNoticesandEvents/PowerSystemIncidentReports/2017/IntegratedFinal-Report-SA-Black-System-28-September-2016.pdf
2. National Grid ESO. Interim Report into the Low Frequency Demand Disconnection (LFDD) following Generator Trips and Frequency Excursion on 9 Aug 2019 (2019)
3. Wang, N.B., Ma, Y.H., Ding, K., et al.: Analysis on root reasons of WTGs nuisance tripping in Jiuquan wind power base. Autom. Electr. Power Syst. 36(19), 42–46 (2012)
4. Song, G.B., Tao, R., Li, B., et al.: Survey of fault analysis and protection for power system with large scale power electronic equipments. Autom. Electr. Power Syst. 41(12), 2–12 (2017)
5. Qiu, Y.T., Pan, W.L., Ni, C.K., et al.: Equal transfer process-based distance protection for wind farm outgoing transmission line. Power Syst. Prot. Control 43(12), 61–66 (2015)