1. Lebrun, Ph.: Cryogenic Systems for Accelerators, in Frontiers of Accelerator Technology, pp. 681–700, Hawaii (1995)
2. Ferlin, G., Bradu, B., Brodzinski, K., Delprat, L., Pezzetti, M.: Cryogenics Experience During Run 2 and impact of LS2 on next run, In: 9th LHC Operations Evian Workshop, pp. 85–90, Evian Les Bains (2019)
3. Serio, L., et al.: CERN experience and strategy for the maintenance of cryogenic plants and distribution systems. In: Advances in Cryogenic Engineering: Cryogenic Engineering Conference, p. 012140, Tucson (2015)
4. Bonetti, N., Ferrand, F., Gayet, P., Knoops, S.: General cryogenic maintenance policy and recent update for CERN assets, In: Cryogenic Operation Workshop, Barcelona (2018)
5. Ferrand, F., Gayet P., Guillotin, N.: Experience from the outsourcing of the cryogenic operation & maintenance at CERN, In: Cryogenic Engineering Conference and International Cryogenic Materials Conference, p. 012084, Connecticut (2019)