Application of BIM Technology in Power Grid Project Construction Management
Publisher
Springer Singapore
Reference10 articles.
1. Xu, Jiang. 2017. Research on application of BIM 5D technology in Central Grand Project. Procedia Engineering 174 (Complete): 600–610.
2. Philip, L. H., Yu, W. K., Li, & Ng, F. C. 2017. The generalized conditional autoregressive Wishart model for multivariate realized volatility. Journal of Business & Economic Stats 35 (4): 513–527.
3. Bose, Bimal, K. 2017. Artificial intelligence techniques in smart grid and renewable energy systems—Some example applications. Proceedings of the IEEE 105 (11): 2262–2273.
4. Iakovlev, I.A., O.M. Sotnikov, and V.V. Mazurenko. 2018. Bimeron nanoconfined design. Physical Review, 97 (18): 184415.1–184415.6.
5. Akinade, O.O., L.O. Oyedele, and S.O. Ajayi, et al. 2018. Designing out construction waste using BIM technology: Stakeholders’ expectations for industry deployment. Journal of Cleaner Production 180 (10): 375–385.