1. Visali N (2014) Real power scheduling of thermal power plants using evolution technique. J Electr Eng (JEE) 14:1–6
2. Singh SP, Tyagi R, Goel A (2014) Genetic algorithm for solving the economic load dispatch. IJEEE Publ 7(5):523–528
3. Kaur A, Singh HP, Bhardwaj A (2014) Analysis of economic load dispatch using genetic algorithm. IJAIEM Publ 3(3):240–246
4. Sahu G, Swarnkar K (2014) Economic load dispatch by genetic algorithm in power system. IJSETR Publ 3(8):2167–2171
5. Khosa FK, Zia MF, Bhatti AA (2015) Genetic algorithm based optimization of economic load dispatch constrained by stochastic wind power, pp 36–40, Presented in ICOSST