Author:
Fatema Nuzhat,Malik Hasmat,Iqbal Atif
Reference28 articles.
1. Hoijat Adelil, Wu Mingyang, Regularization neural network for construction cost estimation. J Construction Engineering and Management 124(1), 18–24 (1998)
2. Hoijat Adelil, Asim Karim, Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management 123(4), 450–458 (1997)
3. Olga Perminova et al., Defining uncertainty in projects – a new perspective. Int. J. Project Manage. 26, 73–79 (2008)
4. Dinu Philip et al., Artificial Neural Network Model for Cost Estimation: City of Edmonton’s Water and Sewer Installation Services. Journal of construction engineering and management 136(7), 745–756 (2009)
5. Abhishek Bhargava et al., Predicting Cost Escalation Pathways and Deviation Severities of Infrastructure Projects Using Risk-Based Econometric Models and Monte Carlo Simulation. Computer-Aided Civil and Infrastructure Engineering 32, 620–640 (2017)
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献