1. Serpell AF (2005) Improving conceptual cost estimating performance. 2005 AACE Int Trans
2. Phaobunjong K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects, 2002
3. Slatoom N, Taneerananon P (2015) A study of a flyover-bridge—improved intersection. Eng J 19(1):1–12. https://doi.org/10.4186/ej.2015.19.1.1
4. Jumas DY, Zainon N, Rahim FAM (2015) The significance of cost variables and their influences on the conceptual cost estimation accuracy 2015(December)
5. Ballard G, Pennanen A (2013) Conceptual estimating and target costing. In: 21st Annual conference of the international group for lean construction, IGLC 2013, January 2013:1–10